100% Original Pipe Insulation Material - Cooling water system – TekMax

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Gaining purchaser gratification is our company's aim eternally. We're going to make great initiatives to create new and top-quality products, satisfy your exclusive prerequisites and supply you with pre-sale, on-sale and after-sale solutions for Fresh Air Control, Handmade Rock Wool Clean Room Panel Handmade Hollow Mgo Clean Room Panel, Insulation Products, Our purpose is always to build Win-win scenario with our customers. We feel we are going to be your greatest choice. "Reputation To start with, Buyers Foremost. "Waiting for your inquiry.
100% Original Pipe Insulation Material - Cooling water system – TekMax Detail:

 

  The process cooling water system consists of the following parts: chillers, pumps, heat exchangers, water tanks, filters, and process equipment.

   Water chiller: Provide cold source for cooling water system.

  Water pump: pressurize the water to ensure its circulation in the cooling system.

   Heat exchanger: Use this equipment to exchange heat between the chilled water system and the chilled water system to transfer the heat generated at the load end of the system to the chilled water system. There are many types of heat exchangers, which can be divided into shell-and-tube type, plate type, plate-fin type, heat pipe type, etc. according to their form. In comparison, the plate heat exchanger has the advantages of a small footprint and a large heat transfer area. Considering the cost characteristics of the space and area of ​​the semiconductor plant, equipment with a small footprint is preferred to save land area and engineering cost.

 

  Water tank: The water tank in the open system mainly plays the role of supplementing water source. The water tank in the closed system needs to choose an expansion water tank. The expansion water tank has three functions. One is to contain and compensate the expansion and contraction of the water in the system; the other is to provide a stable pressure to the closed circulating water system and play a role in system stabilization; The third is as an indication of the system water pump, usually the expansion tank sends a signal to start or shut down the system water pump.

 

   filter: filter out the solid particleThere are two relatively independent systems in the process cooling water system, chilled water and cooling water. The chilled water is provided by the chiller, and the chilled water and the cooling water exchange heat to cool the cooling water and reduce the temperature of the equipment. The water is pumped from the production equipment through the water pump to the heat exchanger to ensure the temperature of the process cooling water by controlling the amount of chilled water, and then sent to the production line equipment after passing the filter, and then back to the water pump. The formation process cooling water repeatedly circulates. The chilled water is directly returned to the chiller.


Product detail pictures:

100% Original Pipe Insulation Material - Cooling water system – TekMax detail pictures


Related Product Guide:

We provide fantastic energy in top quality and advancement,merchandising,gross sales and marketing and operation for 100% Original Pipe Insulation Material - Cooling water system – TekMax , The product will supply to all over the world, such as: Barbados, Egypt, UK, Merchandise have been exported to Asia, Mid-east,European and Germany market. Our company has constantly been able to update the items performance and safety to meet the markets and strive to be top A on stable quality and sincere service. If you have the honor to do business with our company. we'll undoubtedly do our very best to support your business in China.
  • Good quality, reasonable prices, rich variety and perfect after-sales service, it's nice!
    5 Stars By Olivia from Guyana - 2017.10.27 12:12
    A good manufacturers, we have cooperated twice, good quality and good service attitude.
    5 Stars By Esther from United Kingdom - 2018.09.29 17:23
    Write your message here and send it to us