Our eternal pursuits are the attitude of "regard the market, regard the custom, regard the science" and the theory of "quality the basic, belief the very first and management the advanced" for Insulation And Waterproofing, Clean Room, Central Heat And Air Units, Never-ending improvement and striving for 0% deficiency are our two main quality policies. Should you need anything, don't hesitate to contact us.
Fast delivery Function Of Thermal Insulator - Process pipeline installation – TekMax Detail:

①. Installation preparation: Be familiar with the drawings carefully, and make preparations according to the construction method determined by the construction plan and the specific measures of technical disclosure. Refer to relevant professional equipment drawings and decoration building drawings, check whether the coordinates and elevations of various pipelines are crossed, whether the space used for pipeline arrangement is reasonable, and if there is a problem, study and solve the problem with the relevant personnel of the design unit in time, and make a change and negotiation record.

Prefabrication processing: according to the design drawings, draw the construction sketches of the pipeline branch, pipe diameter, reduced diameter, reserved nozzle, valve position, etc., in the actual installation structure position

② Make a mark, measure the exact size of the actual installation according to the marked section, and record it on the construction sketch; then, check whether the pipes and accessories are supplied by the manufacturer, and after confirming that they are correct, prefabricate according to the measured size of the sketch (Broken pipes, fittings, proofreading, group numbers by pipe sections, etc.).

③, dry pipe installation

The riser shall be hoisted from top to bottom to install the clamps, and the height of the clamps near the shear wall shall be 1.8 meters, or a steel composite bracket shall be installed at the pipe well head, and the prefabricated risers shall be installed in a hierarchical order according to the number. Straighten. Temporary plugs should be installed at the branch pipes. The installation direction of the riser valve should be convenient for operation and repair. After installation, use a wire pendant to straighten it, fix it with clamps, and plug the floor hole in cooperation with the civil construction. The installation of multiple risers in the tube well should be installed in the order of the inside first and then the outside, first big and then small. The mark of domestic water pipe is light green, fire pipe is red, rain water pipe is white, and domestic sewage pipe is white.

④ Branch pipe installation

For concealed application of branch pipes in toilets, the length of branch pipes should be determined and then drawn and positioned. Light-weight walls are slotted with a slotting machine, and the prefabricated branch pipes are laid in the grooves. After leveling and alignment, use hook nails or steel nails to bind galvanized iron wires to fix the pipe ; The valve and detachable parts should be provided with inspection holes; each water distribution point should be installed with a bulkhead pipe with a length of 100mm or 150mm, and be aligned and leveled, and then perform a pressure test on the concealed pipeline. After the test is accepted, the pipe groove shall be covered with cement mortar in time.

⑤, pipeline pressure test

The concealed and insulated water supply pipes should be tested individually before being concealed, and the system should be tested after the installation of the piping system. In the hydraulic test, the internal air must be drained first, and then the water should be filled into the water pipe. The pressure is slowly increased to the specified requirement for 6 hours. There is no leakage in the first 2 hours. After 6 hours, the pressure drop does not exceed 5% of the test pressure to be qualified. The general contractor, the supervisor and the relevant personnel of Party A can be notified of the acceptance, go through the visa procedures, and then drain the water, and fill in the pipeline pressure test record in time.


Product detail pictures:

Fast delivery Function Of Thermal Insulator - Process pipeline installation – TekMax detail pictures


Related Product Guide:

Our business puts emphasis over the administration, the introduction of talented staff, plus the construction of employees building, striving hard to boost the standard and liability consciousness of staff members. Our corporation successfully attained IS9001 Certification and European CE Certification of Fast delivery Function Of Thermal Insulator - Process pipeline installation – TekMax , The product will supply to all over the world, such as: Jamaica, Cyprus, Egypt, Our items are exported worldwide. Our customers are always satisfied with our reliable quality, customer-oriented services and competitive prices. Our mission is "to continue to earn your loyalty by dedicating our efforts to the constant improvement of our merchandise and services in order to ensure the satisfaction of our end-users, customers, employees, suppliers and the worldwide communities in which we cooperate".
  • We are a small company that has just started, but we get the company leader's attention and gave us a lot of help. Hope we can make progress together!
    5 Stars By Norma from Los Angeles - 2018.12.10 19:03
    We have worked with many companies, but this time is the best,detailed explanation, timely delivery and quality qualified, nice!
    5 Stars By Dolores from Iraq - 2017.05.02 18:28
    Write your message here and send it to us