Free sample for Chilled Water Supply Temperature - Cooling water system – TekMax

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

As a way to provide you advantage and enlarge our organization, we even have inspectors in QC Crew and guarantee you our greatest assistance and product or service for Stainless Steel Air Shower, Beverage Industry, Ventilation And Exhaust Systems, We have been also the appointed OEM manufacturing unit for several worlds' famous merchandise brands. Welcome to contact us for more negotiation and cooperation.
Free sample for Chilled Water Supply Temperature - Cooling water system – TekMax Detail:

 

  The process cooling water system consists of the following parts: chillers, pumps, heat exchangers, water tanks, filters, and process equipment.

   Water chiller: Provide cold source for cooling water system.

  Water pump: pressurize the water to ensure its circulation in the cooling system.

   Heat exchanger: Use this equipment to exchange heat between the chilled water system and the chilled water system to transfer the heat generated at the load end of the system to the chilled water system. There are many types of heat exchangers, which can be divided into shell-and-tube type, plate type, plate-fin type, heat pipe type, etc. according to their form. In comparison, the plate heat exchanger has the advantages of a small footprint and a large heat transfer area. Considering the cost characteristics of the space and area of ​​the semiconductor plant, equipment with a small footprint is preferred to save land area and engineering cost.

 

  Water tank: The water tank in the open system mainly plays the role of supplementing water source. The water tank in the closed system needs to choose an expansion water tank. The expansion water tank has three functions. One is to contain and compensate the expansion and contraction of the water in the system; the other is to provide a stable pressure to the closed circulating water system and play a role in system stabilization; The third is as an indication of the system water pump, usually the expansion tank sends a signal to start or shut down the system water pump.

 

   filter: filter out the solid particleThere are two relatively independent systems in the process cooling water system, chilled water and cooling water. The chilled water is provided by the chiller, and the chilled water and the cooling water exchange heat to cool the cooling water and reduce the temperature of the equipment. The water is pumped from the production equipment through the water pump to the heat exchanger to ensure the temperature of the process cooling water by controlling the amount of chilled water, and then sent to the production line equipment after passing the filter, and then back to the water pump. The formation process cooling water repeatedly circulates. The chilled water is directly returned to the chiller.


Product detail pictures:

Free sample for Chilled Water Supply Temperature - Cooling water system – TekMax detail pictures


Related Product Guide:

Dedicated to strict high-quality management and considerate shopper company, our experienced team associates are normally available to discuss your requirements and ensure full shopper gratification for Free sample for Chilled Water Supply Temperature - Cooling water system – TekMax , The product will supply to all over the world, such as: Bahamas, Sweden, kazan, To work with an excellent products manufacturer, our company is your best choice. Warmly welcome you and opening up the boundaries of communication. We are the ideal partner of your business development and look forward to your sincere cooperation.
  • With a positive attitude of "regard the market, regard the custom, regard the science", the company works actively to do research and development. Hope we have a future business relationships and achieving mutual success.
    5 Stars By Maud from Somalia - 2018.09.23 18:44
    This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Polly from Luxemburg - 2018.09.16 11:31
    Write your message here and send it to us